...still working on the backsplash in the kitchen...the Man moved the outlets out...so that the plates will rest nicely on top of the new tile...
...he used these new little lego-like spacers...
...easier than the box extenders that we've used before...
...just a couple of intricate little cuts for this side of the sink...
...all done with the right side...
...painting also continues...I've done the second coat on the lower cabinets on this side of the kitchen...no photo as it really doesn't look that different...one more coat...and then when the Man gets the doors and drawers all finished we can move on to the other half of the kitchen...
...and then the very last thing in the hallway bathroom that was left to do was the caulking...so I caulked around the sinks...
...around the toilet...that required some contortions...haha...
...and around the base of the doors...
~Have a lovely day!
Subscribe to:
Post Comments (Atom)
More "wows"....looking great! Love, K
ReplyDelete