...Our Airman installed the new shelves we'd gotten for the pantry...
...and the quarter round as well...the room looks so finished now...also of note...the wall is patched...
...Our Airman's Wife had started painting their bedroom as well...and I sanded the door to their storage area so it could get a nice new coat of paint as well...
...and then Our Airman and I spent hours re-engineering the T-strip molding that we'd bought for the step-down from the tile to the existing Pergo flooring...
...it came with three pieces the top beveled piece and two different height strips to mount on the low side and a metal strip for the T to lock into...but we just couldn't get it to work in this scenario...so we basically chose the taller of the two strips and nailed it directly to the Pergo and then nailed the beveled top piece to that on one side and directly into the channel in the middle...
...I think it turned out pretty perfectly...oh...and that last tile to the right is the one that I had to reset...so it's fine now as well...
~Have a lovely day!
Subscribe to:
Post Comments (Atom)









0 comments:
Post a Comment